History (reverse order) of the ALADIN cycles ALADIN cycle [1] with memorandum [2]available inMajor modifications introduced in the cyclebased on ARPEGE cyclePhasing team AL48T1 1st stage Oct-Dec 2020, with finalization steps in Jan-Feb 2021 see the plans prepared for the 29th LTM meeting (…)
This important operation is completed twice a year to "phase" the ALADIN code with its "mother" code ARPEGE (see history of cycles and phasing team and some statistics on phasing effort).
The ALADIN code is following the ARPEGE one in its permanent evolution (see history of ALADIN cycles). (…)
Published on 11 September 2002
by
Patricia
ALADIN was entirely built on the notion of compatibility with its « mother » system, IFS/ARPEGE. The latter, a joint development between the European Centre for Medium-Range Weather Forecasts (ECMWF) and Météo-France , was only meant to consider global Numerical Weather Prediction (…)
Published on 11 September 2002
by
Patricia
The ALADIN configurations
Nine are currently fully validated (the number is likely to increase in the near future, given the momentum of the project) : e923 : the creation of the « geographical » conditions for any given geometry of the LAM, anywhere on the globe ; e927/ee927 : the creation (…)